St. Peter Hospital was looking for a vibrant, but low maintenance flooring for their new Emergency Center, and the planned renovation of their Main Entrance Lobby. They initially considered classic stain with topical sealer until their walk-through of area projects revealed failed floor after failed floor. Once they saw how poorly the old standard held up, they turned to the RetroPlate System to protect their acid stain. The project was in three phases, with the topping slab formulated with white cement to provide for more vibrant colors. The final acid stain colors were arrived at through blending and overlaying of multiple acid stains. The three phases were placed separately over an 18–month period. All matched perfectly. With the ease of maintenance, the hospital wishes that all of their floors were acid stained and RetroPlated!